what is the freezing point of water in degrees celsius
Logo

Nursing Elites

HESI A2

HESI A2 Quizlet Math

1. What is the freezing point of water in degrees Celsius?

Correct answer: A

Rationale: The correct answer is 0°C. The freezing point of water is 0°C under standard conditions. Water freezes at 0°C and boils at 100°C. Choices B, C, and D are incorrect because they do not represent the freezing point of water. 100°C is the boiling point of water, 50°C and 25°C are not related to the freezing point of water.

2. Multiply: 2 × 5 =

Correct answer: D

Rationale: When you multiply 2 by 5, the result is 10, not 13. Therefore, the correct answer is 10, which is option D. Choices A, B, and C are incorrect because they do not represent the correct product of multiplying 2 by 5.

3. Scientific notation is a way to represent very large or small numbers in a compact form. If a number is written as 4.82 x 10^3, what is the value of the number in standard form?

Correct answer: C

Rationale: Rationale: When a number is written in scientific notation as \(a \times 10^n\), the value of the number in standard form is obtained by multiplying \(a\) by \(10^n\). In this case, the number is \(4.82 \times 10^3\). To convert this to standard form, we multiply 4.82 by \(10^3\), which means moving the decimal point 3 places to the right. \(4.82 \times 10^3 = 4820\) Therefore, the value of the number in standard form is 4820, which corresponds to option C.

4. If two workers can finish building a play set in 18 hours, how long will it take 4 workers to build 3 play sets?

Correct answer: A

Rationale: If 2 workers can complete building one play set in 18 hours, it means one worker would take 36 hours to complete the same task. When the number of workers is doubled to 4, the time is halved, so 4 workers would take 18 hours to build one play set. To build 3 play sets, the total time needed would be 3 times the time for one play set, which equals 54 hours. Therefore, 4 workers can build 3 play sets in 27 hours, making choice A the correct answer. Choices B, C, and D are incorrect because they do not account for the correct relationship between the number of workers and the time required to complete the task.

5. Multiply: 5.04 × 2 =

Correct answer: B

Rationale: To multiply 5.04 by 2, you simply multiply the two numbers together: 5.04 x 2 = 10.08. Therefore, the correct answer is B. Choice A (1.008) is incorrect as it represents the result of dividing 5.04 by 5 instead of multiplying. Choice C (10.8) is incorrect as it is the result of rounding 10.08 to the nearest whole number. Choice D (18) is incorrect as it results from adding 5.04 and 2 instead of multiplying.

Similar Questions

The physician ordered 3,000 units of heparin; 5,000 U/mL is on hand. How many milliliters will you give?
A landscaping plan is drawn on a 1:50 scale. If a deck in the plan measures 12 cm by 10 cm, how large is the deck in real life?
You need to buy cardboard to cover a rectangular box with dimensions 40cm by 30cm by 25cm. Considering only the exterior surfaces (not flaps or openings), how much cardboard do you need (assume one sheet covers 0.5 sq m)?
Stewart has 56 acres of land. He wants to divide the land into plots of 0.25 acres. How many plots of land will Stewart have after he divides the 56 acres?
What is the result of adding 12 1/21 and 3 1/3?

Access More Features

HESI A2 Basic
$49/ 30 days

  • 3,000 Questions with answers
  • 30 days access

HESI A2 Premium
$99/ 90 days

  • Actual HESI A2 Questions
  • 3,000 questions with answers
  • 90 days access

Other Courses