HESI A2
Math HESI A2 Practice Test
1. If a runner runs 5 miles in 45 minutes, what is their average speed in miles per hour?
- A. 6.67 mph
- B. 5 mph
- C. 7 mph
- D. 10 mph
Correct answer: A
Rationale: To find the average speed, first, convert 45 minutes to hours (45/60 = 0.75 hours). Then, divide the distance by the time: 5 miles ÷ 0.75 hours = 6.67 mph. Choice A is correct because it accurately calculates the average speed based on the distance covered and time taken. Choice B is incorrect as it does not consider the time taken to cover the distance. Choice C is incorrect as it is higher than the calculated speed. Choice D is incorrect as it is higher and does not match the calculated average speed.
2. If a horse can trot around a track twice in 10 minutes, how many times will it circle the track at that same speed in half an hour?
- A. 3 times
- B. 5 times
- C. 6 times
- D. 10 times
Correct answer: C
Rationale: If a horse can trot around a track twice in 10 minutes, it completes one circle in 5 minutes. To determine how many times it will circle the track in half an hour (30 minutes), divide the total time by the time taken for one circle: 30 minutes / 5 minutes per circle = 6 times. Therefore, the horse will circle the track 6 times at the same speed in half an hour. Choice A, 3 times, is incorrect as it does not consider the correct time taken for a single circle. Choice B, 5 times, is incorrect as it miscalculates the total number of circles within half an hour. Choice D, 10 times, is incorrect as it overestimates the number of circles the horse can complete in the given time frame.
3. A team from the highway department can replace 14 streetlights in 7 hours of work. If they work a 30-hour week at this job, in how many weeks will they replace all 120 downtown streetlights?
- A. 1½ weeks
- B. 2 weeks
- C. 2½ weeks
- D. 3 weeks
Correct answer: B
Rationale: If the team can replace 14 streetlights in 7 hours, it means they replace 2 streetlights per hour. In a 30-hour week, they can therefore replace 2 x 30 = 60 streetlights. To replace all 120 downtown streetlights, they will need 120 / 2 = 60 hours, which is equivalent to 60 / 30 = 2 weeks. Therefore, the correct answer is 2 weeks. Choice A, 1½ weeks, is incorrect because it doesn't consider the total number of streetlights that need to be replaced. Choice C, 2½ weeks, is incorrect as it overestimates the time needed. Choice D, 3 weeks, is incorrect as it underestimates the efficiency of the team in replacing streetlights.
4. Multiply: 52 × 04 =
- A. 0.00208
- B. 0.0208
- C. 0.208
- D. 2.08
Correct answer: B
Rationale: To multiply 52 by 04, you first multiply the two numbers together: 52 x 4 = 208. Since there are two decimal places in the expression, you need to divide the result by 100, which gives you 0.0208. Therefore, the correct answer is B. Choice A (0.00208) is incorrect because it represents a much smaller value obtained by considering the decimal incorrectly. Choice C (0.208) is incorrect because it does not account for the decimal placement. Choice D (2.08) is incorrect as it does not consider the requirement to convert the result into decimal form.
5. A physician wants to prescribe 5 mg of a medication to a patient. The medication comes in a 2-mg dose per 1-mL vial. How many milliliters of the medication should the patient receive?
- A. 2.5 mL
- B. 2 mL
- C. 3 mL
- D. 1 mL
Correct answer: A
Rationale: To determine the amount of medication the patient should receive, divide the prescribed dose by the dose per mL in the vial. In this case, 5 mg ÷ 2 mg/mL = 2.5 mL. Therefore, the patient should receive 2.5 mL of the medication. Choice B (2 mL) is incorrect because it does not reflect the correct calculation. Choice C (3 mL) is incorrect as it is higher than the actual amount calculated. Choice D (1 mL) is incorrect as it is lower than the actual amount calculated.
Similar Questions
Access More Features
HESI A2 Basic
$49/ 30 days
- 3,000 Questions with answers
- 30 days access
HESI A2 Premium
$99/ 90 days
- Actual HESI A2 Questions
- 3,000 questions with answers
- 90 days access