how many pounds are in 80 ounces
Logo

Nursing Elites

HESI A2

HESI A2 Math Practice

1. How many pounds are in 80 ounces?

Correct answer: A

Rationale: To convert ounces to pounds, you need to know that there are 16 ounces in a pound. Therefore, to find how many pounds are in 80 ounces, you divide 80 by 16, which equals 5 pounds. Thus, the correct answer is 5 pounds. Choice B, 6 pounds, is incorrect because it doesn't accurately reflect the conversion from ounces to pounds. Choice C, 4 pounds, and Choice D, 3 pounds, are also incorrect as they do not align with the correct conversion factor of 16 ounces to 1 pound.

2. What is the probability of rolling a 2 on a six-sided die?

Correct answer: A

Rationale: The correct answer is A: 1/6. A six-sided die has one face with a '2' out of six possible outcomes (numbers 1 to 6). Therefore, the probability of rolling a 2 is 1/6. Choices B, C, and D are incorrect because they do not reflect the specific probability of rolling a 2 on a six-sided die.

3. Bill has 2.5 vacation days left for the rest of the year and 1.25 sick days left. If Bill uses all of his sick days and his vacation days, how many days will he have off work?

Correct answer: D

Rationale: To find the total number of days Bill will have off, add his vacation days and sick days together. Bill has 2.5 vacation days and 1.25 sick days: 2.5 + 1.25 = 3.75 days When rounding to the nearest whole number, 3.75 rounds up to 4. Therefore, Bill will have 4 days off work.

4. Subtract 14.5 - 7.25.

Correct answer: B

Rationale: The correct answer is B. When you subtract 7.25 from 14.5, you get 7.25. The difference between 14.5 and 7.25 is 7.25. Choices A, C, and D are incorrect. Choice A (7.15) is the result of incorrectly subtracting 14.5 - 7.25. Choice C repeats choice A, so it is also wrong. Choice D (7.5) is not the correct result of the subtraction provided in the question.

5. If two workers can finish building a play set in 18 hours, how long will it take 4 workers to build 3 play sets?

Correct answer: A

Rationale: If 2 workers can complete building one play set in 18 hours, it means one worker would take 36 hours to complete the same task. When the number of workers is doubled to 4, the time is halved, so 4 workers would take 18 hours to build one play set. To build 3 play sets, the total time needed would be 3 times the time for one play set, which equals 54 hours. Therefore, 4 workers can build 3 play sets in 27 hours, making choice A the correct answer. Choices B, C, and D are incorrect because they do not account for the correct relationship between the number of workers and the time required to complete the task.

Similar Questions

If Randy sells 8 times as many vacuum cleaners as Janice, and Janice sells 690 vacuum cleaners per year, on average, how many does Randy sell each month?
An IV drip delivers 40 drops per minute, each containing 1mg of medication. How many milligrams are administered in 3 hours (180 minutes)?
A healthcare professional works in a military hospital from 1300 to 2000. What time of day does this healthcare professional work?
Find x if 40:5 = 60:x.
Convert the following military time to regular time: 15:17:52.

Access More Features

HESI A2 Basic
$99/ 30 days

  • 3,000 Questions with answers
  • 30 days access

HESI A2 Premium
$149.99/ 90 days

  • Actual HESI A2 Questions
  • 3,000 questions with answers
  • 90 days access

Other Courses